How Houston Methodist Used its Block Schedule to 3x One Surgeon's Daily Cases

Surgical teams count on the block schedule to manage time, space, and resources, and to drive coordination. Houston Methodist's block schedule had taken on epic proportions but was hiding underutilization and time mismanagement.

Apella's insights and analytics proved that, when it comes to OR operations, even basic processes can be improved without sacrifice. And the new way of visualizing the block schedule including more utilization calculations at the planning stage led to even more successful experiments.

Screenshot 2025-03-19 at 11.53.09 AM

Download the case study to learn how Houston Methodist:

  • Identified 11 extra hours of unscheduled availability
  • Confirmed 20% open time every week
  • Converted several misallocated blocks to an average two hours open time
  • Tripled one surgeon's Monday case volume from five to more than 15 cases